Explosive dust: Gold Series® Dust Collector on dosage devices
Explosive dust: Gold Series® Dust Collector on dosage devices

Explosive dust: Gold Series® Dust Collector on dosage devices

Added to MTDCNC by Camfil APC Ltd on 25 August 2016

MCM HEK based in Lübeck, Germany, is a member of the MCP Group,who have additional facilities in Wellingborough (UK), Fairield (USA)and Shenzen (China). Their activities are based around the production of non-toxic Bismuth chemicals for use in many industries including pharmaceuticals and electronics.

MCP HEK had a fire in 2009, resulting in the destruction of their existing dust extraction plant. To keep production going MCP HEK looked for a company that could provide a quick delivery and maintain their high standards.

Camfil APC in Germany was contacted to carry out a site surveyand present a suitable solution.The main problem was the explosive nature of the dust. The old system had not been equipped with any explosion protection and MCP HEK realised that the incident could have been far more serious if it hadresulted in an explosion rather than a fire.

Camfil APC recommended a Gold Series dust collector fitted witha vertical explosion plenum. In the event of another incident this would vent any explosion safely upwards and away from any personnel orbuildings.

Finding a suitable location for the dust collector was difficult as thefactory is built around a central courtyard, with high walls and windows.It was therefore decided to install the new dust collector outside the building. Due to the location of the factory in a residential area this meant that extra care was required to ensure noise from the system was kept to the minimum.

MCP HEK decided to use the Camfil APC because of the goodengineering work on site, the ease of maintenance on the Gold Series dust collector and the quick delivery.

The system was commissioned and installed following aninitial trial period, some minor modifications were made to improve the performance on site. The system has been running successfully since then.